property in faridabad
KLJ PLATINUM PLUS FARIDABAD
9899-648-140

Popular Search

Hot Projects
Project: Era RedWood Residency
Location: Sec-78, Faridabad
Property: Apartment
Plan: 2BHK-3BHK
Size: 1200-1545 Sq.Ft
Price: INR 35 Lacs Onwards

All Fields Are Mandatory

SUBMIT
 

Price of Bptp Park Floor 1 Faridabad


This is a low density, ground + three and ground + five floors project which is nearing completion. The low-rise homes format allows for maximum access to resources for the residents of Park Floors I. The most attractive feature of this project is the value proposition it offers to prospective home owners. Construction is on in full swing at this project and it will be ready to move in very shortly. With the majority of construction work already completed, these beautifully laid out homes are available for viewing on ground. Park Floors I is in close proximity to Sanctuary, the exclusive club of Parklands. It is also very close to The Next Door, BPTP's commercial and retail centre in Sector 76. This allows residents of Park Floors ease of access to both recreational and retail facilities. The project enjoys great connectivity and other facilities like power back-up, round-the-clock security and water supply - features that are usually a part of high-rise developments.

Fresh Booking in Bptp Park Floors Faridabad


Fresh booking in bptp park floors faridabad

G + 3

2BHK (G + 3) Area = 1220 Square Feet
Particulars Ground Floor First Floor Second Floor Third Floor
 
Basic sale price 2285000 2285000 2285000 1985000
PLC 225000 105150 - 105150
Edc/Idc (@Rs. 324.14 per sq ft) 395454 395454 395454 395454
Cost Escalaction 118472 118472 118472 118472
Electric Connection Charges 44944 44944 44944 44944
Power Backup installation Charges 84270 84270 84270 84270
Stamp Duty Charges 116000 86000 86000 130000
Conveyance Deed Charges 15700 15300 15300 15700
 
Total 3284840 3134590 3029440 2878990
 
3BHK (G + 3) Area = 1464 Square Feet
Particulars Ground Floor First Floor Second Floor Third Floor
 
Basic sale price 2745000 2745000 2745000 2545000
PLC 225000 110300 - 110300
Edc/Idc (@Rs. 326.45 per sq ft) 477923 477923 477923 477923
Cost Escalaction 132253 132253 132253 132253
Electric Connection Charges 44944 44944 44944 44944
Power Backup installation Charges 112360 112360 112360 112360
Stamp Duty Charges 170000 170000 170000 170000
Conveyance Deed Charges 15700 15700 15700 15700
 
Total 3923180 3808480 3698180 3608480
 

G + 5

2BHK (G + 5) Area = 1045 Square Feet
Particulars Ground Floor First Floor Second Floor Third Floor Fourth Floor Fifth Floor
Basic sale price 2040000 2040000 2040000 1772000 1772000 1772000
PLC 225000 100000 - - - 100000
Edc/Idc (@Rs. 338 per sq ft) 353210 353210 353210 353210 353210 353210
Transfer Charges(@Rs.75 per sq.ft.) 78375 78375 78375 78375 78375 78375
Service Tax(@12.36% of transfer charges) 9687 9687 9687 9687 9687 9687
 
Total 2706272 2581272 2481272 2213272 2213272 2313272
 

Time Linked Payment Plans for Groups - B (Towers J to M & P to T) and C (Towers N & U to Z)
Booking Amount 10% Of BSP
Within 45 days of booking 25% Of BSP + 25% Of DC
Within 90 days of booking 25% Of BSP + 25% Of DC
Within 135 days of booking 25% Of BSP + 50% Of DC
Within 180 days of booking 10% of BSP + 100% of PLC
At the time of offer of possession** 5% of BSP
Down Payment Plan For Groups - A (Towers A to H), B & C
At the time of Booking 10% Of BSP
Within 60 days of booking 85% Of BSP + 100% DC + 100% PLC
At the time of offer of possession** 5% of BSP
**The 2nd last and the last installments (offer of possession) may be called simultaneously, depending on the situation at site.
Note: There is no Time Linked Payment Plan in Group - A


*Development Charges” or “DC” shall mean the amount charged by the Company from the Applicant(s), as on the date of making the application, towards carrying out the development works inside or
around the Group Housing Colony, including but not limited to the payment of the following:
a.
i. External Development Charges (EDC) and Infrastructure Development Charges (IDC) as presently conveyed and/or demanded by the HUDA, DTCP or the Government of Haryana with respect to LOI
No.5 DP (IV) – 2007/6305 dated 06/03/2007,
ii. Any interest paid and/or payable thereon to the concerned authorities,

b.
i. Infrastructure Augmentation Charge (IAC) as presently conveyed and/or demanded by the HUDA, DTCP or the Government of Haryana with respect to LOI No.5 DP (IV) – 2007/6305 dated 06/03/2007,
ii. Any interest paid and/or payable thereon to the concerned authorities,

c. The cost of such other development works as may be undertaken by the Company within or around the Group Housing Colony that are not charged specifically elsewhere.

d. Cost incurred by the Company on the capital invested in making the payment of any of the Development Charges. Such cost shall be determined at the rate of (SBI PLR + 5)%

Request for a Payment Plan